3.6.5.3 Main report should bring out the background of the project, its social analysis, details of survey and investigations carried out, ...
-
aspects of the Project are duly covered; that it is technically sound and that it is fit to form the basis of the contract. The following s...
-
All contracts in India are to be within the framework of the Indian Contract Act, 1872, which lays down the general principles relating to ...
-
(d) The Terms of Reference for the FCPPR shall be described precisely to ensure preparation of all the requisite details required for prepa...
-
(c) The Officer undertaking the Peer Review shall be required to certify that he was not associated with the preparation of DPR/with the Co...
-
shall also be scrutinized in NHAI as per the procedure prescribed above. A joint meeting of the Design Consultant, Peer Consultant and NHAI...
-
The studies and recommendations of feasibility study will form the Preliminary Project Report (PPR), as described in Para 3.6.4. On approva...
-
1. All the documents generated or received by the Unit/Division should be kept neatly in the chronological order in proper files. 2. Each ...
-
6. Each Unit/Division will have a file register which will contain the record of all the files maintained in the Unit/Division. This regis...